• Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Intelligence
    • Policy Intelligence
    • Security Intelligence
    • Economic Intelligence
    • Fashion Intelligence
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • LBNN Blueprints
  • Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Intelligence
    • Policy Intelligence
    • Security Intelligence
    • Economic Intelligence
    • Fashion Intelligence
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • LBNN Blueprints

Traffic Update: Lagos Declares 15-Day Closure of Marine Bridge for Vital Maintenance

Simon Osuji by Simon Osuji
October 10, 2025
in Infrastructure
0
Traffic Update: Lagos Declares 15-Day Closure of Marine Bridge for Vital Maintenance
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


The Lagos State Government has declared a temporary halt to the operations of the Marine Bridge located in Ijora, within the Apapa Local Government Area, to facilitate essential maintenance work orchestrated by the Federal Ministry of Works.

In an announcement made on Thursday, the Commissioner for Transportation, Mr. Oluwaseun Osiyemi, revealed that the bridge will be inaccessible for a duration of 15 days, starting from Saturday, October 11, and is set to reopen on Saturday, October 25, 2025.

Osiyemi detailed that the maintenance endeavor will unfold in two phases designed to diminish the impact on traffic flow and ensure an efficient diversion of vehicles throughout the maintenance period.

Phase I is scheduled from October 11 to 18, impacting the segment from the base of the Marine Bridge at Lawani Oguntayo Road (near UBA, heading toward Apapa/Costain).

During this timeframe, drivers traveling from Ijora Olopa towards Apapa will be rerouted via the Ijora Causeway Access Ramp, alongside Omni Retail Company, leading to Ijora 7up, before veering left to Lilypond Access Ramp to continue their journey.

Phase II, planned for October 19 to 25, will encompass the expanse between Ijora Badia and Lilypond Access Ramp (heading toward Apapa).

In this segment, motorists from Ijora Olopa intending to reach Apapa and Costain will be directed roughly 50 meters prior to the work zone into a contraflow lane alongside Costain-bound traffic for approximately 500 meters before integrating back into the primary carriageway.

Additionally, vehicles making their way from Apapa toward Costain, Lagos Island, or Ijora Olopa will continue to benefit from uninterrupted traffic; however, they will temporarily share a contraflow stretch of about 500 meters around the construction site.

Osiyemi urged road users to exhibit patience and collaborate with the traffic management personnel, emphasizing that this temporary closure is crucial for the replacement of the bridge’s foundational bearings, which are vital to its structural robustness and safety.

He reassured that sufficient traffic officers will be deployed along the diversion routes to oversee vehicle movement and mitigate congestion.

“The temporary closure is pivotal for the enduring safety and resilience of the Marine Bridge. This initiative reflects the ongoing partnership between the Lagos State and Federal Governments to improve infrastructure and guarantee safer roads for everyone,” Osiyemi asserted.



Source link

Related posts

NERSA Clears Up SSEG Regulations Following Outa Article

NERSA Clears Up SSEG Regulations Following Outa Article

February 5, 2026
Renishaw Coastal Precinct plans eco-friendly developments for 2026

Renishaw Coastal Precinct plans eco-friendly developments for 2026

February 5, 2026
Previous Post

AI chatbots linked to teen tragedy

Next Post

The case for national monuments

Next Post
The case for national monuments

The case for national monuments

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Whoopi Goldberg Weight Loss: 2025 New Look Unveiled

Whoopi Goldberg Weight Loss: 2025 New Look Unveiled

9 months ago
Fisker is laying off 15% of staff and says it needs more cash ahead of a ‘difficult year’

Fisker is laying off 15% of staff and says it needs more cash ahead of a ‘difficult year’

2 years ago
Mashatile pledges government support for agri at Nampo Cape

Mashatile pledges government support for agri at Nampo Cape

5 months ago
Building on a family wool farming legacy

Building on a family wool farming legacy

6 months ago

POPULAR NEWS

  • Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    0 shares
    Share 0 Tweet 0
  • The world’s top 10 most valuable car brands in 2025

    0 shares
    Share 0 Tweet 0
  • Top 10 African countries with the highest GDP per capita in 2025

    0 shares
    Share 0 Tweet 0
  • Global ranking of Top 5 smartphone brands in Q3, 2024

    0 shares
    Share 0 Tweet 0
  • When Will SHIB Reach $1? Here’s What ChatGPT Says

    0 shares
    Share 0 Tweet 0

Get strategic intelligence you won’t find anywhere else. Subscribe to the Limitless Beliefs Newsletter for monthly insights on overlooked business opportunities across Africa.

Subscription Form

© 2026 LBNN – All rights reserved.

Privacy Policy | About Us | Contact

Tiktok Youtube Telegram Instagram Linkedin X-twitter
No Result
View All Result
  • Home
  • Business
  • Politics
  • Markets
  • Crypto
  • Economics
    • Manufacturing
    • Real Estate
    • Infrastructure
  • Finance
  • Energy
  • Creator Economy
  • Wealth Management
  • Taxes
  • Telecoms
  • Military & Defense
  • Careers
  • Technology
  • Artificial Intelligence
  • Investigative journalism
  • Art & Culture
  • LBNN Blueprints
  • Quizzes
    • Enneagram quiz
  • Fashion Intelligence

© 2023 LBNN - All rights reserved.