• Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Intelligence
    • Policy Intelligence
    • Security Intelligence
    • Economic Intelligence
    • Fashion Intelligence
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • LBNN Blueprints
  • Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Intelligence
    • Policy Intelligence
    • Security Intelligence
    • Economic Intelligence
    • Fashion Intelligence
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • LBNN Blueprints

Ocean Winds installs final turbine at Moray West

Simon Osuji by Simon Osuji
November 15, 2024
in Energy
0
Ocean Winds installs final turbine at Moray West
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter


Ocean Winds has installed the 60th and final wind turbine at its Moray West offshore wind farm in the Moray Firth.

The 882MW wind farm is nearing the end of the construction phase and will become fully operational during 2025 in line with the originally projected commercial operations date.

The project uses Siemens Gamesa SG 14-222 DD wind turbines, each of which can generate up to 14.7MW, making them the largest offshore commercial turbines in Europe.

© Supplied by Ocean Winds
The sun goes down on the  final turbine.

The pre-assembly activity of the 60 turbines has been managed by Siemens Gamesa, Siemens Energy’s wind business, which also manufactured all the 180 blades for the project at its facility in Hull, UK.

Siemens Gamesa has been marshalling all turbine components at Port of Nigg from where the Cadeler heavy lift vessel Wind Orca undertook the installation.

Siemens Gamesa’s technicians on land and on board the vessel have overseen each installation and are in the process of commissioning each turbine.

Project director of Moray West Pete Geddes commented: “What a journey– and what a result!  Subsea surveys, boulder clearance, bomb disposal, scour protection, monopiles, vibro-hammers, transition pieces, cables, onshore and offshore substations – and finally, the deployment of the world’s largest capacity offshore wind turbine to date.

“Moray West really has ‘set the bar high’ in terms of both technological innovation, and rock-solid project execution. More important than ever, the project has been delivered on time, on budget, and with the highest level of quality.”

Moray West is situated next to its sister project Moray East, and close to Ocean Winds 2GW Caledonia project.

Ocean Winds UK country manager Adam Morrison commented: “This is a fantastic milestone to mark the installation of all the wind turbines for Moray West. The project has some way to go before it is fully commissioned, nevertheless this landmark demonstrates Ocean Winds’ commitment to successful delivery through our fantastic professional and safe teams.

“With two more projects in development in the UK and Moray East already operating, we are proud to be leaders in the UK’s energy transition. Over more than a decade developing our projects in the Moray Firth region we have been key drivers in developing the supply chain, creating and support varied jobs in Scotland and the wider UK.”

Recommended for you

Photo by Dominika Zarzycka

World leaders at COP29 agree to a global carbon market… that could finally bite



Source link

Related posts

Ghanaians to pay more for electricity as new tariff hikes begin January 2026 

Can private operators fix Nigeria’s struggling electricity grid?

March 2, 2026
South Africa’s coal output drops to 68% amid rise in solar adoption – Report

South Africa’s coal output drops to 68% amid rise in solar adoption – Report

March 2, 2026
Previous Post

11 Best MIDI Controllers for Synths and More (2024)

Next Post

Jamie Dimon: Bankers ‘Dancing in the Street’ After Trump Win

Next Post
Jamie Dimon: Bankers ‘Dancing in the Street’ After Trump Win

Jamie Dimon: Bankers 'Dancing in the Street' After Trump Win

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Vocal Image is using AI to help people communicate better

Vocal Image is using AI to help people communicate better

6 months ago
Navigating the Angstrom Era – IEEE Spectrum

Navigating the Angstrom Era – IEEE Spectrum

11 months ago
Babcock to Equip S. Korean Jangbogo-III Submarine With Weapons System

Babcock to Equip S. Korean Jangbogo-III Submarine With Weapons System

2 years ago
IADC warns North Sea rig exodus risking renewables projects

IADC warns North Sea rig exodus risking renewables projects

2 years ago

POPULAR NEWS

  • Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    0 shares
    Share 0 Tweet 0
  • Mahama attends Liberia’s 178th independence anniversary

    0 shares
    Share 0 Tweet 0
  • The world’s top 10 most valuable car brands in 2025

    0 shares
    Share 0 Tweet 0
  • Top 10 African countries with the highest GDP per capita in 2025

    0 shares
    Share 0 Tweet 0
  • Global ranking of Top 5 smartphone brands in Q3, 2024

    0 shares
    Share 0 Tweet 0

Get strategic intelligence you won’t find anywhere else. Subscribe to the Limitless Beliefs Newsletter for monthly insights on overlooked business opportunities across Africa.

Subscription Form

© 2026 LBNN – All rights reserved.

Privacy Policy | About Us | Contact

Tiktok Youtube Telegram Instagram Linkedin X-twitter
No Result
View All Result
  • Home
  • Business
  • Politics
  • Markets
  • Crypto
  • Economics
    • Manufacturing
    • Real Estate
    • Infrastructure
  • Finance
  • Energy
  • Creator Economy
  • Wealth Management
  • Taxes
  • Telecoms
  • Military & Defense
  • Careers
  • Technology
  • Artificial Intelligence
  • Investigative journalism
  • Art & Culture
  • LBNN Blueprints
  • Quizzes
    • Enneagram quiz
  • Fashion Intelligence

© 2023 LBNN - All rights reserved.