• Business
  • Energy
  • Markets
  • Intelligence
    • Policy Intelligence
    • Fashion Intelligence
    • Economic Intelligence
    • Security Intelligence
  • Technology
  • Infrastructure
  • Politics
  • LBNN Blueprints
  • Business
  • Energy
  • Markets
  • Intelligence
    • Policy Intelligence
    • Fashion Intelligence
    • Economic Intelligence
    • Security Intelligence
  • Technology
  • Infrastructure
  • Politics
  • LBNN Blueprints
LIVE MARKETS
Initializing...
Home Business

Nguya FLNG Unit to Set Sail for Next Phase of Eni’s Congo LNG Project

Simon Osuji by Simon Osuji
August 26, 2025
in Business
0
Nguya FLNG Unit to Set Sail for Next Phase of Eni’s Congo LNG Project
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter



Aug 26, 2025

(Credit: Eni)


(Credit: Eni)

Italian energy giant Eni has held the sail away ceremony for the Nguya floating liquefied natural gas (FLNG) unit in Shanghai, which is set to depart for Congo LNG project in the Marine XII concession, offshore the Republic of Congo.

The Nguya unit, 376 meters long and 60 meters wide, will be moored at a depth of 35 meters and used for liquefied natural gas production.

Designed with advanced technologies to ensure a reduced carbon footprint, it stands as a benchmark in the industry.

Conceived, designed, and built in only 33 months – from contract award to sail away – the FLNG sets a record for time-to-market in the entire sector.

Moreover, its cutting-edge technical features allow it to process gas from multiple fields, making it suitable for the development of future fields as well.

Furthermore, the floating production and compression unit, formerly the Scarabeo 5 drilling rig, has been refurbished and will depart in the coming days. It will be used to send processed gas to the Nguya unit.

Work on the subsea infrastructure required to launch Phase 2 of the Congo LNG project is progressing on schedule, enabling mooring and startup by the end of 2025.

Tango FLNG (0.6 MTPA) began production in December 2023 and has already exported 12 cargoes. It will be joined by the Nguya FLNG (2.4 MTPA) by the end of the year, bringing the total capacity of the Congo LNG project to 3 MTPA.

Source link

Previous Post

ECRDA support helps farmer move to next level

Next Post

Study says AI chatbots inconsistent in handling suicide-related queries

Next Post
Study says AI chatbots inconsistent in handling suicide-related queries

Study says AI chatbots inconsistent in handling suicide-related queries

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

  • Mahama attends Liberia’s 178th independence anniversary

    Mahama attends Liberia’s 178th independence anniversary

    0 shares
    Share 0 Tweet 0
  • Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    0 shares
    Share 0 Tweet 0
  • The world’s top 10 most valuable car brands in 2025

    0 shares
    Share 0 Tweet 0
  • Top 10 African countries with the highest GDP per capita in 2025

    0 shares
    Share 0 Tweet 0
  • Global ranking of Top 5 smartphone brands in Q3, 2024

    0 shares
    Share 0 Tweet 0

Get strategic intelligence you won’t find anywhere else. Subscribe to the Limitless Beliefs Newsletter for monthly insights on overlooked business opportunities across Africa.

Subscription Form

© 2026 LBNN – All rights reserved.

Privacy Policy | About Us | Contact

Tiktok Youtube Telegram Instagram Linkedin X-twitter
No Result
View All Result
  • Home
  • Business
  • Politics
  • Markets
  • Crypto
  • Economics
    • Manufacturing
    • Real Estate
    • Infrastructure
  • Finance
  • Energy
  • Creator Economy
  • Wealth Management
  • Taxes
  • Telecoms
  • Military & Defense
  • Careers
  • Technology
  • Artificial Intelligence
  • Investigative journalism
  • Art & Culture
  • LBNN Blueprints
  • Quizzes
    • Enneagram quiz
  • Fashion Intelligence

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.