Sunday, May 11, 2025
LBNN
  • Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • Documentaries
No Result
View All Result
LBNN

N3’s Cleland Overpass temporarily closed for demolition

Simon Osuji by Simon Osuji
January 15, 2024
in Infrastructure
0
N3’s Cleland Overpass temporarily closed for demolition
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter


The South African National Roads Agency (Sanral) has announced the closure of the N3 from 6pm on 20 January 2024 to 6am on 21 January 2024, to facilitate the demolition of the Cleland bridge. This is part of ongoing road improvements to the road which will benefit road users in the medium-to long-term.

Related posts

Soil And Groundwater Rehabilitation In South Africa’s Petrochemical And Mining Sectors

Soil And Groundwater Rehabilitation In South Africa’s Petrochemical And Mining Sectors

May 9, 2025
Biggles Removals weekly update on Pretoria East’s property, infrastructure and moving activity

Biggles Removals weekly update on Pretoria East’s property, infrastructure and moving activity

May 9, 2025
Source: Supplied

Source: Supplied

“Full closures will take place at Ashburton and Market Road interchange with both the Northbound and Southbound traffic being unable to access the N3 during said times. The closures are due to the demolition of the Cleland Bridge on the N3 North and South Bound as part of the N3 construction process.

“The traffic accommodation team, with the assistance of the Road Traffic Inspectorate (RTI), will manage and monitor the diversion of traffic to the R103,” says Jason Lowe, Sanrals’s Eastern reion project manager.

The road closures will take place as follows:

• On 20 January 2024 from 6pm to 12am, the N3 will be closed and will proceed to break the bridge structure.
• On 21 January 2024 from 12am to 6am, the complete breaking, clean and reopening of the N3 will take place allowing for traffic to flow.

The available alternative routes to traffic are:

• Northbound traffic is to be taken off at the Ashburton Interchange onto R103 and back onto the N3 at Market Road Intersection.
• Southbound traffic is to be taken off at the Market Road Interchange onto R103 and back onto the N3 at the Ashburton Intersection.

The closure may need to be adjusted depending on weather conditions on the day. Sanral will keep the travelling public updated on progress and changes to the above through further media statements.

“Sanral apologises to the motoring public for any inconvenience caused during the road closure. This is an unavoidable consequence of the road improvements. Attempts have been made to minimise disturbances as far as possible and closures have been restricted to hours when traffic is at its lowest level,” says Lowe.

Motorists are urged to be patient while driving through the alternative routes, to plan and adjust their route trips ahead of time and to adhere to signage and speed limits.



Source link

Previous Post

Community Pass Customer Summit In Uganda Paves The Way For Mastercard’s Digital And Financial Inclusion

Next Post

Death Announcement Of Nancy Mwihaki Njoroge Of Plano, Texas

Next Post
Death Announcement Of Nancy Mwihaki Njoroge Of Plano, Texas

Death Announcement Of Nancy Mwihaki Njoroge Of Plano, Texas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Watu Enhances Kisumu Boda-Boda Riders Operations with Essential Office Equipment

Watu Enhances Kisumu Boda-Boda Riders Operations with Essential Office Equipment

11 months ago
The Army wants to roboticize forklifts

The Army wants to roboticize forklifts

8 months ago
ADNOC saves $500mln from implementing 30 AI tools

ADNOC saves $500mln from implementing 30 AI tools

10 months ago
11 Best Tents (2024): Backpacking, Family, and Ultralight

11 Best Tents (2024): Backpacking, Family, and Ultralight

1 year ago

POPULAR NEWS

  • Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    0 shares
    Share 0 Tweet 0
  • When Will SHIB Reach $1? Here’s What ChatGPT Says

    0 shares
    Share 0 Tweet 0
  • Matthew Slater, son of Jackson State great, happy to see HBCUs back at the forefront

    0 shares
    Share 0 Tweet 0
  • Dolly Varden Focuses on Adding Ounces the Remainder of 2023

    0 shares
    Share 0 Tweet 0
  • US Dollar Might Fall To 96-97 Range in March 2024

    0 shares
    Share 0 Tweet 0
  • Privacy Policy
  • Contact

© 2023 LBNN - All rights reserved.

No Result
View All Result
  • Home
  • Business
  • Politics
  • Markets
  • Crypto
  • Economics
    • Manufacturing
    • Real Estate
    • Infrastructure
  • Finance
  • Energy
  • Creator Economy
  • Wealth Management
  • Taxes
  • Telecoms
  • Military & Defense
  • Careers
  • Technology
  • Artificial Intelligence
  • Investigative journalism
  • Art & Culture
  • Documentaries
  • Quizzes
    • Enneagram quiz
  • Newsletters
    • LBNN Newsletter
    • Divergent Capitalist

© 2023 LBNN - All rights reserved.