Saturday, May 24, 2025
LBNN
  • Business
  • Markets
  • Politics
  • Crypto
  • Finance
  • Energy
  • Technology
  • Taxes
  • Creator Economy
  • Wealth Management
  • Documentaries
No Result
View All Result
LBNN

Kellas Midstream secures first hydrogen customer for H2NorthEast

Simon Osuji by Simon Osuji
November 29, 2023
in Energy
0
Kellas Midstream secures first hydrogen customer for H2NorthEast
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Kellas Midstream has lined up its first customer to receive blue hydrogen from the H2NorthEast project, with Statera Energy eyeing supplies for use in nearby power stations.

Under a heads of terms agreement announced on Wednesday, flexible generation and storage operator Statera would use hydrogen from the H2NorthEast project in Teesside to power its plants at Saltholme.

Based at the Kellas-operated Central Area Transmission System (CATS) Terminal – which serves around 30 North Sea fields and handles around a quarter of the UK’s gas production – the project aims to produce hydrogen from gas, with carbon dioxide captured and stored offshore in the Northern Endurance reservoir.

It is set to deliver 355MW of hydrogen in Phase 1, growing to more than 1GW by 2030 and contributing as much as 10% of the UK’s target hydrogen capacity.

It forms a key linchpin in the East Coast Cluster decarbonisation project which secured government backing under the Track 1 CCS cluster process in 2021.

Described by the company as a “significant first” for the H2NorthEast, the new  agreement sets out how Kellas and Statera will work together to shore up supplies of hydrogen and support decarbonisation of Statera’s Teesside operations.

Work on the scheme is already well underway, with Worley recently picked deliver a full-scope FEED package for Phase 1 over the next year.

Kellas CEO Nathan Morgan said: “The signature of these Heads of Terms further enhances our collaboration with Statera and represents a hugely positive step for the H2NorthEast project. It follows on from our announcements earlier this year regarding the project successfully entering front end engineering and design and securing government funding through the Net Zero Hydrogen Fund.”

Statera operates two gas-fired power stations at Saltholme North and South, which together represent 100MW of flexible generation that can be switched on during periods of high demand, often known as “peaker” plants.

Statera plans to use the hydrogen from H2NorthEast to fuel switch from natural gas and help transition its sites into the first low carbon flexible generation facilities in operation in the UK.

Statera boss Tom Vernon added: “Decarbonising thermal generation will be essential if the UK is to meet its objective of a net zero power system by 2035. Alongside power CCUS, Statera believes hydrogen fired generation will be critical in providing the long duration response required to support the intermittency of renewables.

“These heads of terms are an important first step in the decarbonisation of our flexible generation projects at Teesside. We look forward to working closely with Kellas as it progresses the exciting H2NorthEast project to an investment decision.”

Recommended for you

bp adnoc h2teesside

Report warns UK CCS capacity will fall short of 2030 targets



Source link

Related posts

Egypt seeks to secure 60 LNG cargoes as energy crisis deepens

Egypt seeks to secure 60 LNG cargoes as energy crisis deepens

May 23, 2025
Ethiopia’s 100 MW Assela Wind Farm begins operation for the first time

Ethiopia’s 100 MW Assela Wind Farm begins operation for the first time

May 23, 2025
Previous Post

German import prices down 13.0% y/y in October

Next Post

Dollar slides as treasuries rally more on Fed bets: Markets wrap

Next Post
Dollar slides as treasuries rally more on Fed bets: Markets wrap

Dollar slides as treasuries rally more on Fed bets: Markets wrap

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Future Construkt Secures CMA License For REIT Management In Kenya

Future Construkt Secures CMA License For REIT Management In Kenya

6 months ago
Tech layoffs are back with a vengeance

Tech layoffs are back with a vengeance

2 years ago
92 million Nigerians lack access to electricity from the national grid- FG

92 million Nigerians lack access to electricity from the national grid- FG

1 year ago
Nigeria: Lagos High Court Blocks Powercom’s Acquisition Of KEDCO

Nigeria: Lagos High Court Blocks Powercom’s Acquisition Of KEDCO

2 years ago

POPULAR NEWS

  • Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    Ghana to build three oil refineries, five petrochemical plants in energy sector overhaul

    0 shares
    Share 0 Tweet 0
  • When Will SHIB Reach $1? Here’s What ChatGPT Says

    0 shares
    Share 0 Tweet 0
  • Matthew Slater, son of Jackson State great, happy to see HBCUs back at the forefront

    0 shares
    Share 0 Tweet 0
  • Dolly Varden Focuses on Adding Ounces the Remainder of 2023

    0 shares
    Share 0 Tweet 0
  • US Dollar Might Fall To 96-97 Range in March 2024

    0 shares
    Share 0 Tweet 0
  • Privacy Policy
  • Contact

© 2023 LBNN - All rights reserved.

No Result
View All Result
  • Home
  • Business
  • Politics
  • Markets
  • Crypto
  • Economics
    • Manufacturing
    • Real Estate
    • Infrastructure
  • Finance
  • Energy
  • Creator Economy
  • Wealth Management
  • Taxes
  • Telecoms
  • Military & Defense
  • Careers
  • Technology
  • Artificial Intelligence
  • Investigative journalism
  • Art & Culture
  • Documentaries
  • Quizzes
    • Enneagram quiz
  • Newsletters
    • LBNN Newsletter
    • Divergent Capitalist

© 2023 LBNN - All rights reserved.